Tribunal orders Sunrise Power, promoter Leno Adesanya to bear 75% of Nigeria’s $11.82m legal costs
Nigeria has secured a significant legal outcome in the long-running dispute over the proposed Mambilla hydropower project after an International Chamber of Commerce (ICC) arbitration tribunal in Paris dismissed a $2.35 billion claim brought by Sunrise Power and Transmission Company Limited.
The final award was issued on Thursday, September 17, 2026, following years of arbitration over the proposed 3,050-megawatt power project in Taraba State.
The dispute dates back to a 2003 agreement under which Sunrise Power was to develop the Mambilla project on a build-operate-transfer basis. The proposed project was valued at about $6 billion.
Sunrise commenced arbitration proceedings against Nigeria in October 2017, seeking approximately $2.354 billion over an alleged breach of contractual obligations.
According to reports on the tribunal’s decision, the panel also dismissed Sunrise’s claim that Nigeria had breached obligations contained in a 2020 settlement agreement and a subsequent addendum.
The company had sought an additional $400 million, comprising a $200 million settlement sum and another $200 million stated as a default payment.
The tribunal further held that Leno Adesanya, the promoter of Sunrise Power, was bound by the arbitration agreement and that it had jurisdiction over Nigeria’s counterclaim involving him and his firm.
In another major aspect of the ruling, Sunrise Power and Adesanya were ordered to reimburse 75 per cent of Nigeria’s legal fees and expenses incurred during the arbitration.
The amount put at $11,819,506.51 includes $2.5 million to be recovered from funds held in escrow with the ICC, while approximately $9.32 million is payable by Sunrise and Adesanya, with interest accruing at 10 per cent annually, compounded annually, until settlement.
The arbitration costs were reportedly fixed at about $1.66 million, with Sunrise and Adesanya responsible for 75 per cent and Nigeria for the remaining 25 per cent.
The Mambilla controversy has stretched across several Nigerian administrations. The original 2003 agreement and the subsequent 2020 settlement have both been subjects of controversy.
Former President Olusegun Obasanjo previously disputed having authorised the original contract, while former President Muhammadu Buhari also said he did not authorise the 2020 settlement agreement. Their positions were reported during the broader legal dispute surrounding the project.
The proposed Mambilla plant, if eventually developed, is designed to generate about 3,050MW, making it one of Nigeria’s major planned hydropower projects.
The latest ICC award brings a significant development to the arbitration aspect of the long-running Mambilla dispute, although other legal and administrative issues surrounding the project have existed separately.